A reconstruction of the Tierra de Barros hospital built to train staff in occupational risk. The point is to avoid the heavy cost of shutting an entire hospital down to run a fire drill: staff can rehearse as often as they need at no cost per session, and arrive better prepared for a real emergency.
The project, carried out together with Plena Inclusión Extremadura, also presents a proposal for adapted signage designed by the organisation itself, so that people with cognitive disabilities can follow it.
The project in motion
Video
4 images
Gallery
Next project
The Attic
Let's talk.
Cuéntanos qué quieres conseguir y te decimos si la realidad virtual o aumentada es la herramienta adecuada. Si no lo es, también te lo diremos.
06800 Mérida, España



